• Home
  • Services
  • Gallery
  • Praise
  • Projects
  • Team
  • Contact

Bluewater was pleased to get the opportunity to work on this beautiful custom boat. Our work began with the installation of a new watermaker. From there, we cut out the existing steel water tanks and replaced them with brand new plastic ones. To power the watermaker, a new generator was needed. Our crew installed the ____, a top of the line performer amongst generators. The work didn’t stop there. We continued our overhaul with a new autopilot system, and later new PC navigation software with exterior display.

FrancoMichienzi Design © 2011
BLUEWATER RIGGING 1816 Mast Tower Road, Vancouver BC, V6H 4B6